Christmas has passed and the contractors are back on site and right on target.


Some construction statistics:

➢ There are 863 bearing piles totalling 11 km in length and 73 marine piles totalling 1506 m in length.

➢ 290 sheet piles have been used.

➢ Approximately 2478 tonnes of rebar will be used in the reinforcement of Blocks F1 and F2.

➢ Approximately 34,000 m3 (the equivalent of 14 Olympic swimming pools) of water has been removed from the cofferdam.